As per the media reports Tata Power Renewable Energy Ltd has signed an agreement with state-owned SJVN Ltd to set up a 460 MW Firm and Dispatchable Renewable Energy project.
As per the reports the plant designed to meet the 460 MW FDRE requirement, integrates solar, wind, and battery storage technologies to ensure efficient energy dispatch during peak hours, thereby stabilizing the grid. The plant is expected to generate nearly 3,000 million units (MUs) of power and offset 2,200 million kgs of CO2 emissions annually. This partnership with SJVN Ltd will witness the deployment of sustainable energy solutions from TPREL. the total renewables capacity of TPREL has reached 9,421 MW (PPA capacity is 7,978 MW) including 4,906 MW projects under various stages of implementation. The company’s operational capacity stood at 4,515 MW, which includes 3,485 MW solar and 1,030 MW wind power.
#dailyaawaz #newswebsite #news #newsupdate #hindinews #breakingnews #headlines #headline #newsblog #hindisamachar #latestnewsinhindi
Hindi news, हिंदी न्यूज़ , Hindi Samachar, हिंदी समाचार, Latest News in Hindi, Breaking News in Hindi, ताजा ख़बरें